Embedded Generation

We are pleased to process any applications on submission of the relevant application form which you can download below.

We are reviewing the Buy Back Tariff with a view to introducing a new single kWh rate. The rate will be similar to the current Day Rate.

Installation of any generator less than or equal to 16A per phase must comply with Engineering  Recommendations G83-2 'Recommendations for the Connection of Type Tested Small-scale Embedded Generators (Up to 16A per Phase) in Parallel with Low-Voltage Distribution Systems'.

Installation of any generator greater than 16A per phase must comply with Engineering Recommendations G59-3 'Recommendations for the Connection of Generating Plant to the Distribution Systems of Licensed Distribution Network Operators'.