Planning your installation

If you have already read our guide to renewable systems at home, this guide will help you to plan your embedded generator installation. It covers the following topics:

Please carefully follow these steps to ensure your solar or wind installation meets our standards and guidelines.

Step 1 - Get planning permission & choose a certified installer

Before installing embedded generation, you must obtain the necessary planning permission from the Government of Jersey's Planning and Building Services.

When choosing your installer, ensure they have proper certification and are familiar with regulations G83 or G59 for fitting embedded generators.

Step 2 - Complete an Electricity Supply Enquiry (ESE)

To complete an Electricity Supply Enquiry (ESE) form you will need to provide the following:

  • A site location plan
  • A ground floor drawing with all existing services and/or the proposed new services marked
  • All your proposed electrical load in kilowatts (kW)
  • All your current electrical loads in kilowatts (kW)

The ESE should be completed by a person with a good knowledge of the property's required electrical loads. If your are not confident you can accurately work out the property's required electrical load, we recommend asking an experienced electrical contractor to complete the ESE on your behalf.

The ESE form is an editable PDF. You can complete it using a computer, or print it and fill it out by hand.

Electricity Supply Enquiry

157kb
Download

Step 3 - Return the completed ESE to our team

By email

Please send the completed form to our ESE Team by email to ese@jec.co.uk.

By post / by hand

ESE Team
Jersey Electricity
The Powerhouse
Queens Road
St Helier JE4 8NY

By hand only

La Collette Power Station Reception.

Step 4 - We confirm receipt of your application

Once we've received your completed ESE form, we will send you written confirmation and begin processing your application.

Step 5 - Submit an Embedded Generation form

At Jersey Electricity we refer to all solar and wind systems that create renewable energy as Embedded Generation.

To ensure the installation of your system meets our guidelines, you'll need your installer to complete the correct Embedded Generation form.

Your installer can use our Embedded Generation Form Finder tool to find the correct form and guidelines. Alternatively, download our Embedded Generation Form decision tree.

The correct Embedded Generation form must be completed BEFORE work on installing your system begins.

Embedded Generator Decision Tree

91kb
Download

Step 6 - Installation inspection by our engineer

Once you have our approval and you installer has carried out your installation, we will send an engineer to inspect it.

Step 7 - Fitting a buy back meter

A Buy Back meter allows you to sell surplus electricity back to us at the Buy Back tariff rate.

Once your installation has been approved by our engineers, we can fit a Buy Back meter beside your existing outdoor meter at no cost.

Need more information?

For further information on additional load or supply installation, please speak to our ESE Team.

Phone Graphic

Phone

Call our ESE team on  01534 505712.

Call us
Email Graphic

Email

Start an email conversation with a member of our ESE team.

Email us
Divider SVG

Thank you for your feedback.

Did you find this page helpful?

Negative Feedback Form

Let us know what went wrong and how we could improve it. We're unable to reply to questions submitted on this form. If you have a query, please email the team at jec@jec.co.uk .