Meter cupboard drawings
| Type | Tariff(s) | Drawing Reference |
| Recessed (Medium) | G/D only | |
| Recessed (Large) | G/D, C/H, E7, E20, E20+ | |
| Surface (Small) | G/D only | |
| Surface (Large) | G/D, C/H, E7, E20, E20+ | |
| Freestanding | G/D, C/H, E7, E20, E20+ | |
| Blockbuilt | G/D, C/H, E7, E20, E20+ |
For more information, please contact Customer Care on: 01534 505460 or email ese@jec.co.uk
Metering installation drawings
| Tariff(s) | Description | Drawing Reference |
|
G/D E7 |
Single rate tariff Economy 7 tariff rate change only |
|
|
E7 E20+ C/H E20 |
Economy 7 direct load switch Approved heating Economy20+ Approved off peak Comfort Heat Approved off peak Economy 20 |
|
|
Green Export Guarantee |
Single phase Green Export Guarantee |
|
|
Site Temp |
Temporary supplies for construction and demolition sites |
|
For more information, please contact our Metering Department by email at metering@jec.co.uk